Home Capability
What we control
The checks and paperwork that decide whether a replacement part gets approved on site.
/01
OEM quality standards
Dimensional and material specifications matched to original equipment tolerances.
/02
Precision engineering
Machined on calibrated equipment with in-process gauging at every critical stage.
/03
100{f4504602a9ffcec74e20b1d9a2ec7f882c35869c9340424ef39e2ed086d02a57} inspection
Every part is checked before packing — we do not batch-sample.
/04
Hydro leak testing
Pumps and housings are pressure-tested and certified leak-free before dispatch.
/05
Material test certificates
MTCs issued with the shipment so your inspection team can verify on arrival.
/06
PPAP support
Full production part approval documentation for OEM and tier-one programmes.
/07
Export handling
Export documentation, packing and dispatch managed in-house from Pune.
/08
Technical support
Part identification and cross-referencing from our engineering desk in Pune.